  • Installation of the current transformer, P1 side toward the power supply.
  • Attach the transformer with colson straps.
  • Connect white wire/S1 of the transformer to the positive terminal of the energy meter.
  • Connect black wire/S2 from the transformer to the negative terminal of the energy meter.
  • Adjust for incorrect connection using energy meter settings.
  • Check connection of the RJ12 cable on a three-phase transformer thoroughly, must click 2 times. See also the section RJ12 cable connection in Chapter 3 of this manual.
  • Tighten the cables running through the transformer with cable spacers.


Types

Calculus offers the following Eastron meters:

  • SDM120MOD Energymeter 45A - 1F - ModBus - MID
  • SDM230MOD Energymeter 100A - 1F - ModBus - MID
  • SDM630MCT - Modbus - MID - V2 - 3F/100A
  • SDM630MCT - ML - 1L - MID - 3F - ModBus - 1xRJ12CT
  • SDM630MCT - ML - 2L - MID - 3F - ModBus - 2xRJ12CT
  • SDM630MCT - ML - 4L - MID - 3F - ModBus - 4xRJ12CT
  • SDM630MCT - MODBUS - MID - 3F - CT
  • SDM630MCT-RC - ModBus - Rogowski Coil - MID
  • Eastron SDM72D-M-2-MID Energymeter - 3F - ModBus - MID

The type of energy meter is indicated above the energy meter display.


Information regarding the specifications such as, for example: 3x230/400V can be found below the display (see image above). 

See also the manuals and data sheets attached.